    Nitrogen and phosphorus removal from sewage by anaerobic, anoxic and aerobic activated sludge

    A municipal plant treating domestic sewage, designed in three stages, whose first stage for 720,000 population equivalent started operating in 2004. It is built for biological nitrogen and phosphorus removal and discharges the treated water to a dam reservoir. Nitrogen is not yet limited at its discharge, but a limit may come, so operating conditions that would meet it with less energy were sought.

    Treatment line

    1. 01Coarse screenSewage arrives through two separate collectors.
    2. 02Pumping stationLifts the sewage to the fine screen.
    3. 03Fine screen
    4. 04Grit and grease trap
    5. 05Selector tank536 m³, where the sewage meets the returned sludge.
    6. 06Anaerobic tank18,610 m³, where phosphorus release takes place.
    7. 07Six aeration tanks with anoxic zones28,328 m³ each, fed in parallel, with internal recycle from the aerobic to the anoxic zone at 4.4 times the flow; the anoxic zone is one fifth of the volume.
    8. 08Six final clarifiers2,380 m² surface each; four to six were in service during the year, and settled sludge returns to the selector.

    What the source found

    Over the ten months the line removed about 92% of COD, 95% of BOD, 93% of suspended solids, 99% of ammonia, 83% of total nitrogen and 51% of phosphorus. The plant ran at a sludge age of 39 to 94 days, far above its 21-day design. The model showed that the internal recycle could be cut from 4.4 to 2.5 times the flow, or the anoxic share raised to half the volume, and the plant would still meet the expected nitrogen limit while saving energy.

    The operator's daily flow readings and weekly to five-times-weekly inlet and outlet samples over ten months (305 days) were summarised, then used to calibrate a computer model of the plant and test operating scenarios.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    Flowm3/day122,216
    CODCODmg/L3843292%
    BOD5BOD5mg/L164995%
    Total suspended solidsTSSmg/L1971493%
    Volatile suspended solidsVSSmg/L1711094%
    Total nitrogenTNmg/L46.87.983%
    Ammonium nitrogenNH4-Nmg/L28.90.499%
    Nitrite nitrogenNO2-Nmg/L0.2
    Nitrate nitrogenNO3-Nmg/L6.3
    Total phosphorusTPmg/L5.12.551%
    pH7.7
    Temperature°C19

    Inlet: raw wastewater at the plant inlet. Outlet: treated effluent at the plant outlet. Means over a 305-day operating period of operator samples taken weekly to five times a week. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.