COD and nitrogen removal from industrial zone wastewater by coagulation and anoxic/oxic process
The central treatment plant of an industrial zone, designed for about 4000 m³/day, takes the wastewater of dyeing and textile, mechanical engineering, leather and footwear, food processing and electroplating factories. Most factories pre-treat their own wastewater before sending it to the plant, which treats the whole zone's wastewater to the national industrial discharge regulation.
Treatment line
- 01Equalization tank
- 02Primary physicochemical processCoagulation and settling with lime or a ferric coagulant.
- 03Anoxic/oxic processMain biological stage. The plant ran at a hydraulic retention time of 1.89 days and a sludge retention time of 22.5 days.
- 04Secondary physicochemical process
- 05Disinfection
What the source found
The plant lowered COD by 86%, total nitrogen by 79% and phosphorus by 77%, and effluent COD stayed within its discharge limit. Colour fell by 66%. The laboratory membrane bioreactor removed COD, nitrogen and phosphorus faster, but the full-scale anoxic/oxic line removed colour faster.
Mean inlet and outlet values of the full-scale line were compared with those of a laboratory membrane bioreactor fed with the plant's water after the first physicochemical stage.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| pH | 7 | 7.6 | |||
| COD | COD | mg/L | 539 | 74 | 86% |
| Total nitrogen | TN | mg/L | 38.8 | 8.3 | 79% |
| Total phosphorus | TP | mg/L | 7.1 | 1.6 | 78% |
| Colour | Pt-Co | 590 | 201 | 66% |
Inlet: plant influent as labelled for the anoxic/oxic process (sampling point not stated). Outlet: plant effluent as labelled for the anoxic/oxic process (sampling point not stated). Means with standard deviations of the full-scale line; number of samples not stated. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.