Aguato

    COD and suspended solids removal from textile wastewater by electrolysis and activated sludge

    A textile factory in Bahir Dar, in north-western Ethiopia, collects the wastewater from all its process units in one line and treats it in an activated sludge plant built in 2013/14, discharging to a nearby river. The plant was designed for an average of 600 m³/day and a peak of 1200 m³/day, and received about 600 m³/day during the study. A multigrade filter and a guard pond follow the secondary clarifier but were not working and were not studied.

    Treatment line

    1. 01Intake and grit chamberReceives the combined factory wastewater.
    2. 02Equalization tankSulfuric acid is added here because the inflow is usually alkaline.
    3. 03Electrolysis systemThe chromium reduction across the plant is attributed to this unit.
    4. 04Pumping stations
    5. 05Primary clarifier with coagulation and flocculationAlum and polyaluminium chloride are dosed to form settleable flocs.
    6. 06Activated sludge processConventional aerated biological treatment.
    7. 07Secondary clarifierLast working unit before discharge; the final sampling point.

    What the source found

    From inlet to secondary clarifier outlet the plant removed about 75% of suspended solids, 70% of COD and 68% of BOD, with an average overall removal of 65% across the parameters studied. Suspended solids, BOD, COD and phosphorus were above the discharge limit throughout the study, the average chromium in the treated water was also above its limit, and iron rose slightly across the plant. An effluent quality index method put the plant's performance at 38% and 42% by its two calculations and judged it unsatisfactory.

    Weekly samples at six points from the raw inlet to the secondary clarifier outlet, February to July 2021, 792 samples in total, analysed on site and in a laboratory.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    Total suspended solidsTSSmg/L29373.275%
    Volatile suspended solidsVSSmg/L194.7659.2870%
    BOD5BOD5mg/L150.2548.4568%
    CODCODmg/L483.27144.0870%
    AmmoniaNH3mg/L121.9684%
    NitriteNO2−mg/L2.11.3635%
    NitrateNO3−mg/L3.553.44.2%
    Total Kjeldahl nitrogenTKNmg/L27.988.7369%
    Total nitrogenTNmg/L35.1213.4962%
    Total phosphorusTPmg/L13.057.940%
    Total alkalinityAlkmg/L97.7166.2232%
    pH8.028.29
    Dissolved oxygenDOmg/L1.66.22
    Total dissolved solidsTDSmg/L412.33403.72.1%
    Electrical conductivityECµS/cm685.13661.69
    PotassiumKmg/L3.412.3830%
    CalciumCamg/L47.8344.566.8%
    MagnesiumMgmg/L16.7115.825.3%
    IronFemg/L0.20.29
    ZincZnmg/L0.320.2716%
    Total chromiumCrmg/L0.260.1639%
    Temperature°C26.4825.37

    Inlet: raw wastewater at the plant inlet. Outlet: outlet of the secondary clarifier. Means of weekly samples taken from February to July 2021. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.