Aguato

    COD and suspended solids removal from batik wastewater by a subsurface flow constructed wetland

    A communal plant in operation since 2001 in a village of Pekalongan City, Central Java, treating wastewater from 80 batik enterprises. It covers 3,000 m² and has a capacity of 400 m³/day.

    Treatment line

    1. 01Equalization pondReceives the raw batik wastewater; its sludge is withdrawn once a year.
    2. 02Five parallel horizontal subsurface flow constructed wetlands3,000 m² in total, filled with zeolite on impermeable sheets and planted with one plant species.

    What the source found

    In the October 2018 round the wetlands removed 93% of COD, 84% of BOD and 94% of suspended solids. The effluent met the provincial standard through 2018 except for BOD and COD during a maintenance period in February. Clogging of the bed by solids is a weakness, and heavy tropical rain can make the open wetlands overflow to rivers.

    Inlet and outlet samples from three monitoring rounds in 2018, taken from the city environmental office's data; the figures used are from the October 2018 round.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    Temperature°C2929
    BOD5BOD5mg/L2724384%
    CODCODmg/L6474593%
    Total suspended solidsTSSmg/L69494%
    Total chromiumCrmg/L0.010.020%
    Total ammoniaNH3mg/L10.71.289%
    pH87.7

    Inlet: raw batik wastewater at the plant inlet. Outlet: constructed wetland effluent at the plant outlet. One monitoring round in October 2018 from the city environmental office's data. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair. A parameter at 0% did not fall between the inlet and the outlet.