BOD and COD removal from paper mill effluent by coagulation, activated sludge and sand filters
The effluent treatment plant of a packaging paper mill in an industrial city in the Eastern Province of Saudi Arabia, with an average capacity of 550 tonnes of paper a day and about 2,500 m³/day of wastewater. The wastewater first passes an 880 m³ equalisation basin, and the line described starts after it. About half of the filtered effluent is recycled to the production line and the rest goes to a central industrial treatment plant.
Treatment line
- 01Flash mixing basinA 3.5 m³ basin, the first part of the chemical treatment unit, which uses alum and polymer as coagulant and caustic soda to make up for the alkalinity lost to the alum.
- 02ClariflocculatorA 222 m³ unit where flocculation and settling take place together.
- 03Selector basinsPlaced ahead of the aeration tank to curb filamentous bacteria and improve sludge settling; ammonia solution and phosphoric acid are added before the biological stage.
- 04Complete-mix activated sludge with clarifierAeration tank run at high organic load and high mixed liquor solids, followed by clarification.
- 05ChlorinationApplied before the filters to prevent biological growth inside them.
- 06Sand filtersFinal tertiary stage.
- 07DechlorinationAfter filtration, before reuse or discharge.
What the source found
Most of the BOD and COD was removed in the activated sludge stage; the sand filters removed little more, because most of what remained was in soluble form. The wastewater lacked nitrogen and phosphorus, and even after dosing the phosphorus supply stayed low, so a higher phosphorus dose is recommended to improve treatment and allow more reuse. The coagulation step did little better than plain settling without chemicals, so alum and polymer could be dropped to cut chemical and sludge handling costs.
Weekly samples over two months of the equalised raw wastewater and of the effluents of the chemical unit, the activated sludge unit and the filters, plus a laboratory settling test on the raw wastewater without chemicals; the figures shown compare the equalised raw wastewater with the final filtered effluent.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| pH | 5.6 to 5.8 | 7.2 to 7.5 | |||
| Turbidity | NTU | 454 | |||
| Chloride | Cl− | mg/L | 555 | ||
| Total alkalinity | Alk | mg CaCO3/L | 185 | ||
| COD | COD | mg/L | 9,507 | 750 | 92% |
| BOD | BOD | mg/L | 5,279 | 233 | 96% |
| Suspended solids | TSS | mg/L | 1,747 | 110 | 94% |
| Settleable solids after 30 min | mL/L | 35 | |||
| Total phosphorus | TP | mg/L | 0.83 | 0.31 | 63% |
| Total nitrogen | TN | mg/L | 2.1 | 6.5 |
Inlet: raw wastewater after the equalisation basin. Outlet: final effluent of the sand filters. Means of weekly samples over two months. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.