    BOD and nitrogen removal from domestic sewage by a sequencing batch reactor

    A domestic sewage plant for 1,100 population equivalent with two sequencing batch reactors, receiving about 210 m³/day. The sewage is held in a stabilization tank, which also takes the supernatant from the sludge thickener, before it enters the reactors. This is the reactor that ran without any iron dosing, as the control for a trial of iron electrolysis on the other reactor.

    Treatment line

    1. 01Sequencing batch reactor173 m³ tank on a 6 hour cycle of three mixing and aeration steps, 1 hour settling and 2 hours discharge, taking 32 m³ of sewage per cycle.

    What the source found

    The reactor removed about 97% of suspended solids, 98% of BOD and 91% of total nitrogen, the same as the reactor with iron dosing. It also removed phosphorus biologically without any added iron, because the mixing phases turned anaerobic once nitrate was used up, though its effluent phosphorus stayed higher than in the dosed reactor.

    Samples about every 10 days, in the stabilization tank for the inlet and at the reactor outlet, over four runs in parallel with the reactor fitted with iron electrolysis. BOD, suspended solids and nitrogen are averages over all four runs.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    Suspended solidsTSSmg/L1203.897%
    BODBODmg/L210399%
    Total nitrogenTNmg/L433.592%
    Total phosphorusTPmg/L4.5
    AlkalinityAlkmg/L160

    Inlet: sewage in the stabilization tank ahead of the reactors. Outlet: outlet of the control reactor without iron dosing. Means over four runs of samples taken about every 10 days. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.