BOD and suspended solids removal from low-strength sewage by conventional activated sludge
A large municipal sewage plant in Giza Governorate, built in 1965, receiving low-strength sewage at an average of about 385,000 m³/day against a design capacity of 330,000 m³/day. Sewage first passes screens, grit chambers, preliminary aeration tanks and primary settling tanks; the figures here cover the secondary stage after primary settling. The treated water goes to one chlorine tank and is then discharged to an agricultural drain.
Treatment line
- 01Aeration tanks90 rectangular tanks, 40 m by 5 m and 5 m deep, in three modules, with returned activated sludge.
- 02Final settling tanks12 tanks, 36 m across and 3 m deep.
What the source found
The calibrated model showed that bypassing primary settling would not change BOD and COD removal, would lower suspended solids removal and would raise ammonia removal. In the model, an anoxic zone made no significant difference to the plant. Plastic filling media in the aeration tanks let the modelled plant take more flow while keeping BOD and ammonia removal stable.
Daily samples by the plant laboratory from January to November 2019, reported as monthly averages of the primary settling tank effluent and the final settling tank effluent, then used to calibrate a process model. The removal figures are from the first month only.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| Total suspended solids | TSS | mg/L | 80 | 26 | 68% |
| BOD5 | BOD5 | mg/L | 76 | 19 | 75% |
| COD | COD | mg/L | 164 | 59 | 64% |
| Ammonium nitrogen | NH4-N | mg/L | 19.5 | 9.9 | 49% |
Inlet: primary settling tank effluent entering the aeration tanks. Outlet: final settling tank effluent. Monthly average of daily plant laboratory samples, first month of 2019. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.