COD and BOD removal from municipal sewage by an advanced sequencing batch reactor
A municipal plant in the Al-Montazah district of Alexandria treats domestic sewage pumped in from four residential areas, with a treatment capacity of 35,000 m³ per day; it began operating in 2014. The effluent is discharged to a drain that flows into a bay, and the aim is treated water good enough for reuse in irrigation.
Treatment line
- 01ScreensPreliminary treatment of the incoming sewage.
- 02Grit removalPreliminary treatment ahead of the biological stage.
- 03Aerated distributionThe screened and de-gritted flow is aerated as it is distributed to the reactor.
- 04Advanced sequencing batch reactorTime-based cycles of filling, reaction, settling, decanting and rest; surplus sludge is sent to a sludge thickener.
- 05Chlorination and disinfectionTertiary treatment before discharge.
What the source found
Over the 18 months the plant removed 92% of COD, 94% of BOD and 95% of suspended solids, and the effluent stayed within the national limits for discharge to water. Nitrate rose across the plant, which is put down to nitrification in the reactor. A calibrated process model reproduced the effluent well in steady state, with larger deviations for suspended solids and nitrate in the dynamic runs.
150 inlet and outlet samples taken ten to twelve times a month from January 2022 to July 2023, of which 100 remained after outliers were removed; the averages were then used to calibrate and validate a process model.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| Total suspended solids | TSS | mg/L | 182.14 | 8.57 | 95% |
| Total dissolved solids | TDS | mg/L | 844.59 | 741.07 | 12% |
| COD | COD | mg COD/L | 405.07 | 30.64 | 92% |
| BOD5 | BOD5 | mg O2/L | 189.25 | 12.14 | 94% |
| Nitrate nitrogen | NO3-N | mg N/L | 1.34 | 4.66 | 0% |
Inlet: raw domestic sewage at the plant inlet. Outlet: treated effluent at the plant outlet. Means of inlet and outlet samples taken from January 2022 to July 2023, after removal of outliers. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair. A parameter at 0% did not fall between the inlet and the outlet.