Aguato

    BOD and COD removal from city sewage by UASB reactors followed by activated sludge

    The city sewage treatment plant of Tunja, Boyacá, at 2,750 m altitude, receives sewage through a combined gravity sewer and treats it in three parallel modules. One module, which must meet the national discharge standard, was followed through its start-up and first 300 days of operation.

    Treatment line

    1. 01Coarse and fine screening
    2. 02Grit removal
    3. 03UASB reactor2,895 m³ working volume and 5 m water depth; in steady operation it took most of the raw flow, with a retention time of about 10 hours.
    4. 04Activated sludge aeration tank2,469 m³ with a retention time of about 7.6 hours and intermittent aeration of 45 minutes on and 15 minutes off; it also receives part of the raw sewage through a bypass.
    5. 05Two circular secondary settlers23.5 m in diameter and 4.5 m liquid depth, with sludge returned to the aeration tank.

    What the source found

    In the final 24-hour sampling the module removed about 95% of BOD, 86% of COD, 90% of suspended solids, 82% of iron and 34% of phosphorus, and the effluent met the national limits for COD, BOD and suspended solids. With its short sludge age the plant did not nitrify, so ammonia barely fell. Starting the aerobic tank first, keeping part of the raw sewage bypassing the UASB to it and checking settleable solids leaving the UASB daily were needed, because UASB effluent solids degraded the activated sludge.

    Daily to twice-weekly sampling of raw sewage, UASB effluent and final effluent over the start-up and steady state, plus one 24-hour composite sampling of the inlet and outlet at the end of the evaluation, which gives the figures shown.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    Aciditymg CaCO3/L<10<10
    CODCODmg/L68398.386%
    BOD5BOD5mg/L4102295%
    Total suspended solidsTSSmg/L1982090%
    Settleable solidsml/L2.8 to 7.0<0.1
    Ammonia nitrogenNH3-Nmg N/L4743.6
    Nitrate nitrogenNO3-Nmg N/L<0.05<0.05
    Nitrite nitrogenNO2-Nmg N/L0.1690.123
    Total Kjeldahl nitrogenTKNmg N/L62.351
    AluminiumAlmg AL/L1.19<0.5
    BTEXµg/L<40<40
    CadmiumCdmg Cd/L<0.01<0.01
    CyanideCN−mg CN/L<0.01<0.1
    CopperCumg Cu/L0.038<0.02
    True colour at 426 nm7.83.160%
    True colour at 525 nm3.92.146%
    True colour at 620 nm3.41.168%
    Volatile phenolic compoundsµg/L<10<10
    ChlorideCl−mg Cl/L20550%
    Total hardnessTHmg CaCO3/L14859.460%
    Calcium hardnessmg CaCO3/L5421.860%
    Total chromiumCrmg Cr/L<0.02<0.02
    Total phosphorusTPmg P/L7.975.2734%
    OrthophosphatePO43−mg P/L5.333.0942%
    Hydrocarbonsmg Hydrocarbons/L3.92<1.0
    Aromatic hydrocarbonsµg/L<5.0<5.0
    MercuryHgmg Hg/L<0.001<0.001
    NickelNimg Ni/L<0.05<0.05
    Total ironFemg Fe/L1.980.34982%
    Total silverAgmg Ag/L<0.02<0.02
    LeadPbmg Pb/L<0.1<0.1
    Anionic surfactantsmg SAAM/L2.063.660%
    SulfateSO42−mg SO4-2/L67.987.30%
    SulfideS2−mg S-2/L3.15<1.0
    ZincZnmg Zn/L0.23<0.05

    Inlet: raw sewage at the plant inlet. Outlet: final effluent after the secondary settlers. One 24-hour composite sampling of inlet and outlet at the end of the evaluation period. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair. A parameter at 0% did not fall between the inlet and the outlet.

    Similar references