    Nickel removal from plating effluent by sulfide precipitation, filter press and air oxidation

    The nickel effluent station of an electronic components factory in northeast Brazil that makes resistors, where ceramic rods are nickel-coated in a nickel chloride bath. The spent nickel chloride solutions are rich in metals and must be pretreated before they go to the site's biological treatment plant. Three storage tanks with a total of 35 m³ hold the effluent ahead of the reactors.

    Treatment line

    1. 01Reactor 1, sulfide precipitationA 7 m³ reactor where caustic soda first reduces the acidity and sodium sulfide is added in excess to precipitate nickel sulfide.
    2. 02Filter pressRetains the nickel sulfide precipitate.
    3. 03Reactor 2, sulfide oxidationA 7 m³ reactor where the leftover sulfide in the filtrate is oxidised with compressed air before discharge to the biological plant.

    What the source found

    The station removed above 99% of the nickel and met the national nickel limit, and also cut copper and iron. Air oxidation left too much of the excess sulfide to meet the discharge limit, so laboratory tests compared hypochlorite, hydrogen peroxide and permanganate as replacements, with sodium hypochlorite performing best. COD barely changed and chloride and sulfate rose, and these are left to the downstream activated sludge plant.

    Monitoring by the plant operator in 2005, with one set of figures for the liquid of reactor 1 and one for reactor 2. The number of samples is not given.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    CODCODmg/L8,9828,5594.7%
    CopperCumg/L8.40.298%
    SilverAgmg/L1.60.194%
    TinSnmg/L0.30>99.9%
    PalladiumPdmg/L0.370>99.9%
    IronFemg/L1.60.2883%
    ChlorideCl−mg/L2,4936,9990%
    NickelNimg/L6000.899.9%
    SulfateSO42−mg/L4511,5800%
    SulfideS2−mg/L20011
    pH3.26.9
    Temperature°C28.427.9

    Inlet: liquid in reactor 1 (sulfide precipitation). Outlet: liquid in reactor 2 (after filter press and air oxidation). One set of operator monitoring figures from 2005 for each reactor; number of samples not given. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair. A parameter at 0% did not fall between the inlet and the outlet.