BOD and nitrogen removal from university campus sewage by waste stabilization ponds
A waste stabilization pond system of seven ponds treating the sewage of a university campus in Jimma, southwest Ethiopia, designed to serve a population of 40,000. The mean raw sewage flow was about 2,250 m³/day, measured by the fill and empty method over about seven days.
Treatment line
- 01Anaerobic pond stageBOD and suspended solids were removed mainly here and in the facultative stage.
- 02Facultative pond stageAlso removed BOD and suspended solids; its area was judged too small for the organic load.
- 03Maturation pond stageTotal nitrogen, phosphorus and coliform bacteria were removed mainly here.
What the source found
The ponds removed about 75% of BOD, 57% of COD, 79% of total nitrogen and 69% of phosphorus, with an overall plant efficiency of 73.5%. The treated water still did not meet the national discharge limits for BOD, COD, suspended solids, phosphorus and coliform bacteria, and was rated poor quality. The plant needs proper preliminary treatment such as a septic tank, a changed pond design, desludging, extra treatment and regular monitoring.
Sixty samples taken at the inlet and outlet of the plant and its ponds, three times per location timed by retention time, from January to March 2020.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| pH | 7.52 | 8.5 | |||
| Dissolved oxygen | DO | mg/L | 1.56 | 2.12 | |
| Temperature | °C | 25.3 | 21.9 | ||
| Turbidity | NTU | 345 | 122.8 | 64% | |
| Electrical conductivity | EC | µS/cm | 1,346.4 | 850.8 | |
| BOD5 | BOD5 | mg/L | 472.9 | 117 | 75% |
| COD | COD | mg/L | 1,051.3 | 457.5 | 57% |
| Total suspended solids | TSS | mg/L | 643.9 | 220.5 | 66% |
| Total nitrogen | TN | mg/L | 82.8 | 17.4 | 79% |
| Ammonia nitrogen | NH3-N | mg/L | 2.5 | 1.18 | 53% |
| Nitrate | NO3− | mg/L | 0.58 | 0.17 | 71% |
| Total phosphorus | TP | mg/L | 15.6 | 4.8 | 69% |
| Phosphate | PO43− | mg/L | 11.6 | 3.36 | 71% |
| Total coliforms | TC | MPN/100 mL | 4.87 × 10^8 | 3.41 × 10^3 | >99.9% |
| Faecal coliforms | FC | MPN/100 mL | 1.5 × 10^4 | 8.54 × 10^2 | 94% |
Inlet: raw wastewater at the pond system inlet. Outlet: final effluent of the pond system. Means of samples taken from January to March 2020. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.