Arsenic and iron removal from well water by solar electrolytic chlorination and filtration
A solar-powered pilot unit was installed in Chandamari village in Nadia District, West Bengal, India, on a 12 m deep well in a river floodplain, where the groundwater carries high arsenic, iron, phosphate and ammonium. The unit was built to remove arsenic without adding any chemicals, using the iron already in the groundwater and chlorine made from its natural chloride. Over ten months it treated 393 m³, about 1.35 m³ a day.
Treatment line
- 01Inline electrolytic cellProduces chlorine from the natural chloride in the pumped groundwater to oxidize iron, arsenic, manganese and ammonium, at about 60 litres per hour.
- 02Co-precipitationArsenic is taken up on the freshly formed iron hydroxide in the flowing water.
- 03Two pressure filters in seriesEach holds a 66 cm bed of manganese dioxide coated sand on 15 cm of gravel; a second filter was added for the final phase and both are backwashed daily with treated water.
- 04Treated water storage tank
What the source found
Arsenic removal improved over the test to 94% in the final phase, after the chlorine output was raised and a second filter was added to stop iron breaking through, and the final phase met the local guideline throughout and the stricter international guideline most of the time. Iron removal in the final phase was above 99%, but manganese and ammonium reached safe levels only in the phase where enough chlorine was produced to pass the breakpoint; in the final phase manganese removal was 55%. Lime scale on the electrodes needed manual cleaning, and backwash sludge was settled in a tank before the surplus water was released.
Raw and treated water were sampled twice a week in the first two phases and weekly in the last two, across four operating phases from September 2016 to July 2017.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| Total arsenic | As | µg/L | 165 | 10 | 94% |
| Total iron | Fe | mg/L | 5.5 | 0.03 | 99.5% |
| Manganese | Mn | mg/L | 1.31 | 0.6 | 54% |
| Ammonium nitrogen | NH4-N | mg/L | 1.86 | 0.96 | 48% |
| Orthophosphate | PO43− | mg/L | 1.6 | 0.4 | 75% |
| Chloride | Cl− | 121 | |||
| Free available chlorine | Cl2 | mg/L | 0.16 | ||
| Total chlorine | Cl2 | mg/L | 1.47 | ||
| Electrical conductivity | EC | µS/cm | 1,180 | 1,146 | |
| pH | 6.48 | 6.67 | |||
| Redox potential | ORP | mV | -97 | 399 | |
| Temperature | °C | 32.5 | 32.9 |
Inlet: groundwater from the well. Outlet: treated water after the dual filters. Means of the final operating phase (Phase 4) of a September 2016 to July 2017 field test. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.