Water tools

    Ozone: transferred dose, CT from a decaying residual, and the dose for a coliform target

    Ozone is made on site, transferred into the water at less than full efficiency, satisfies an immediate demand, and then decays while it disinfects. Each step is a short calculation.

    Oxygen-fed generators 6 to 16% by weight, about 80 to 220 mg/L.
    From a batch decay test at the design residual; falls as the residual rises.
    Gas balance
    Transferred dose
    11.40mg/L
    Transfer efficiency
    95.0%

    Contactors reach 90 to 99%.

    CT credit
    CT delivered by the decaying residual
    1.85mg·min/L
    CT without decay
    8.70mg·min/L
    Coliform target
    Utilised dose for the coliform target
    4.61mg/L
    Applied dose at this transfer efficiency
    4.85mg/L

    How it works

    Dtransferred=QgQl(Cg,in−Cg,out)TE=Cg,in−Cg,outCg,in(1)
    C(t)=C0e−kdtCT=C0kd(1−e−kdt)(2)

    For wastewater coliform the ozone response follows a log-log form whose intercept equals the initial demand:

    NN0=(Uq)−nU=q(N0N)1/nDapplied=UTE(3)
    where
    Dtransferred
    ozone transferred into the water, mg/L
    Qg,Ql
    gas and water flow, L/min
    Cg,in,Cg,out
    ozone in feed gas and off-gas, mg/L
    TE
    transfer efficiency, fraction
    C(t)
    residual after time t, mg/L
    C0
    residual leaving the dosing zone, mg/L
    kd
    decay constant, 1/min
    CT
    dose delivered, mg·min/L
    N,N0
    coliform after and before
    U
    utilised ozone dose, mg/L
    q
    initial ozone demand, mg/L
    n
    slope of the dose response
    Dapplied
    applied dose, mg/L

    No CT credit is taken in the dosing compartment. Decay is faster at high pH, high organic carbon and high temperature, and slower with high alkalinity. Bench units must match the full-scale dosing-compartment residence time; dispersion in the contactor is handled separately. Over-dosing raises bromate.