Water tools

    Contact time for iron oxidation by oxygen and manganese by permanganate

    Iron oxidation by air is a hundred times faster per pH unit. Manganese needs a stronger oxidant or a very high pH. Both rates turn into reactor volumes directly.

    Seeds the autocatalytic path.
    Iron by oxygen
    Iron half-life
    47.4min
    Plug-flow contact time
    192.3min
    Completely mixed contact time
    1,070.7min
    Plug-flow volume
    1,335m³
    Completely mixed volume
    7,435m³
    pKw used
    14.53
    Manganese by permanganate
    Manganese plug-flow time
    1.7s
    Manganese completely mixed time
    10.8s

    How it works

    Ferrous iron oxidation by oxygen is first order in iron and second order in hydroxide:

    −d[Fe2+]dt=k[Fe2+][OH−]2PO2kr=k[OH−]2PO2k=8.0×1013L2mol2min atm(1)
    τPFR=1krlnC0CτCMFR=C0−CkrC(2)

    Manganese by permanganate has an oxidative path and an autocatalytic path on existing dioxide:

    k′=9.55×1012[KMnO4][OH−]1.1+8.7×103[MnO2](3)
    where
    [Fe2+]
    ferrous iron concentration
    k
    rate constant, 8.0 × 10¹³ L²/mol²·min·atm at 20 °C
    [OH−]
    hydroxide concentration, mol/L
    PO2
    oxygen partial pressure, atm
    kr
    pseudo first-order rate constant, 1/min
    τPFR,τCMFR
    contact time in plug flow and in a completely mixed reactor, min
    C0,C
    iron in and target, mg/L
    k′
    pseudo first-order constant for manganese, 1/s
    [KMnO4]
    permanganate concentration, mol/L
    [MnO2]
    manganese dioxide present, mol/L

    Valid above pH 5.5 without organic complexation; humic iron oxidises far slower. Ionic strength cuts the rate several-fold in brackish water. Plug flow gives the minimum time; baffled basins of 15 to 30 minutes after the aerator are usual for iron, and pilot tests are needed because colloidal iron does not follow the kinetics. Manganese by oxygen is impractical below pH 9.

    Related reading

    These calculators use standard published formulas and are provided for preliminary engineering guidance. Confirm against measured data and vendor projections before design. Model your full water matrix in Nepti or post your project to compare provider proposals.