    COD and BOD removal from pig farm wastewater by upflow settler and UASB reactor

    The pig unit of a university experimental farm in Igarapé, Minas Gerais, with nursery, growing and finishing houses for a herd of 400 animals. The waste flows by gravity along channels to the treatment plant, and coarse solids are not removed mechanically on the farm, which raises the solids in the wastewater.

    Treatment line

    1. 01Two-compartment upflow settler7.4 m³, hydraulic retention time 0.9 to 2.2 days; separates solids and pre-acidifies the wastewater.
    2. 02UASB reactor11.5 m³ masonry and reinforced concrete tank, hydraulic retention time 1.7 to 4.1 days, seeded with sludge from an anaerobic lagoon.

    What the source found

    Mean removals over the whole line were 93% for COD, 92% for BOD and 88% for suspended solids, and the reactor stayed stable without build-up of volatile acids. Sludge particles were washed out of the UASB blanket with the effluent throughout the study, and sludge production was low. The final COD and BOD concentrations were still above the national discharge standards, although the removal efficiency met the national requirement.

    Samples three times a week at the settler inlet, the settler outlet and the UASB outlet over 282 days of monitoring, with flows measured during morning cleaning.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    Temperature°C2022
    pH77.1
    Total alkalinityAlkg CaCO3/L3.13.7
    Total volatile acidsg HAc/L2.90.9
    BODBODg/L11.10.893%
    CODCODg/L31.31.894%
    Total suspended solidsTSSg/L8.60.990%
    Volatile suspended solidsVSSg/L6.50.7

    Inlet: raw pig farm wastewater entering the upflow settler. Outlet: outlet of the UASB reactor. Means of samples three times a week over 282 days of monitoring. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.