    COD and suspended solids removal from sewage and septage in ponds, 12 days of retention

    A municipal waste stabilization pond system in Butuja, Mwanza, serving about 3,500 connected households and also taking faecal sludge delivered by vacuum trucks. It is designed for 5,000 m³/day, but the average measured flow was 5,952 m³/day, with a theoretical retention of 12 days. The effluent is discharged into a lake.

    Treatment line

    1. 01Two septage lagoonsReceive faecal sludge delivered by vacuum trucks.
    2. 02Three anaerobic pondsConnected in parallel.
    3. 03Four facultative pondsConnected in parallel.
    4. 04Six maturation pondsConnected in series.

    What the source found

    The system removed 63% of COD, 66% of suspended solids and 33% of total nitrogen, the best nitrogen removal of the three pond systems studied. Effluent COD exceeded the national discharge standard and suspended solids were slightly above it. The effluent met the international faecal coliform guideline for irrigation reuse and the national coliform discharge limit, but not the international guideline for helminth eggs.

    Four samples from each pond system were analysed for COD, suspended solids and total nitrogen, and removal was worked out from the influent and effluent values. The systems were visited monthly, four or five times, between February and August 2018, and flow was measured on site with a tracer.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    CODCODmg/L57521563%
    Total suspended solidsTSSmg/L31110566%
    Total nitrogenTNmg/L573833%
    pH7.48.2
    Temperature°C2830
    Ascaris lumbricoides eggseggs/L190>99.9%
    Hookworm eggseggs/L320.299.4%
    Trichuris trichiura eggseggs/L00
    Trichostrongylus spp eggseggs/L82.371%
    Fasciola spp eggseggs/L80>99.9%
    Taenia spp eggseggs/L00
    Total helminth eggseggs/L672.596%
    Giardia lamblia (oo)cysts(oo)cysts/L90>99.9%
    Entamoeba histolytica/dispar (oo)cysts(oo)cysts/L800>99.9%
    Entamoeba coli (oo)cysts(oo)cysts/L1270>99.9%
    Cryptosporidium spp (oo)cysts(oo)cysts/L120.398%
    Isospora spp (oo)cysts(oo)cysts/L30>99.9%
    Total protozoan (oo)cysts(oo)cysts/L2310.399.9%
    Faecal coliformsFCcfu/100 ml1.01 × 10^84.92 × 10^3

    Inlet: raw wastewater entering the pond system. Outlet: outlet of the final maturation pond. Means over four or five monthly visits between February and August 2018 for parasites and faecal coliforms. COD, suspended solids and total nitrogen are from four samples per pond system; pH and temperature were measured on site at sampling. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.