    BOD and COD removal from power-station sewage by anaerobic and activated sludge stages

    An underground sewage treatment plant serves a 335 MW gas-turbine power station in Ondo State, with a design capacity of 5 m³/day. It combines anaerobic and aerobic biological treatment in six stages, and the disinfected effluent is discharged to a river.

    Treatment line

    1. 01ScreenRemoves coarse solids and large particles from the incoming sewage.
    2. 02Primary sedimentationAn underground storage tank where sludge settles and accumulates.
    3. 03Anaerobic chamberAttached-growth process that breaks down organic matter without oxygen.
    4. 04Aerobic chamberThree-chamber activated sludge stage aerated by an air blower, with part of the flow pumped back for further aeration.
    5. 05Secondary sedimentation chamberClarifier where heavier solids settle before the effluent goes to disinfection.
    6. 06DisinfectionSodium hypochlorite made on site, with a contact time of at least 15 minutes before discharge.

    What the source found

    On average the plant removed about 49% of BOD and 53% of COD, a moderate performance. The average effluent met the national discharge standards, but its biodegradability barely changed, so it still carries a notable organic load; seeding the raw sewage and process optimisation are recommended.

    Inlet and outlet samples taken every month for 12 months, from July 2020 to June 2021.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    BOD5BOD5mg/L87.9844.1750%
    CODCODmg/L177.782.0554%
    Dissolved oxygenDOmg/L2.99
    Total suspended solidsTSSmg/L15.1915.19

    Inlet: raw sewage at the plant inlet. Outlet: treated sewage at the plant outlet. Annual means of monthly samples from July 2020 to June 2021. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.