    COD and nitrogen removal from landfill leachate by ammonia stripping, MBR and nanofiltration

    The leachate treatment plant of a municipal solid waste landfill on the Asian side of Istanbul, Turkey, which receives about 4,000 tonnes of waste a day on a 100 ha site. The landfill produces about 1,200 m³ of strong leachate a day, and the plant has a capacity of 1,200 m³/day. Treatment is needed to remove organic matter and ammonium before the leachate is discharged.

    Treatment line

    1. 01Ammonia stripping tankRemoves ammonia so it does not inhibit the biological stage.
    2. 02Primary sedimentation tank
    3. 03Side-stream aerobic/anoxic membrane bioreactorAn aerobic/anoxic tank for nitrification and denitrification, coupled to external ultrafiltration membranes with 30 nm pores run at 6.4 bar.
    4. 04NanofiltrationRun at 14 to 15 bar; membranes are flushed for 3 to 5 minutes every 2 to 3 hours and chemically cleaned in place when flux falls.

    What the source found

    The full line removed about 99% of COD and about 96% of total nitrogen, despite an unbalanced carbon to nitrogen ratio. Biological nitrogen removal gets harder as a landfill ages, but the combined biological and membrane line still gave high removal and high effluent quality.

    Average concentrations in the plant influent, the bioreactor effluent and the nanofiltration permeate, from data supplied by the landfill operator.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    CODCODmg/l24,00025099.0%
    Total nitrogen as NTNmg/l2,89012196%
    Ammonium nitrogenNH4-Nmg/l2,313

    Inlet: raw leachate at the plant inlet. Outlet: nanofiltration permeate, the final effluent. Average concentrations from operating data supplied by the landfill operator; period not stated. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.