Landfill leachate treatment before discharge by anaerobic, facultative and maturation ponds
A controlled landfill in Depok City, in use since 1984, treats its leachate in a pond system before discharging it to a river. Raw leachate first passes an equalization tank, then three stabilization ponds in series. The ponds are the section studied here.
Treatment line
- 01Anaerobic pond3.5 m deep, 278.85 m² in area, with a detention time of 10.7 days.
- 02Facultative pond3.5 m deep, 80.29 m² in area, with a detention time of 3.1 days.
- 03Maturation pond3.5 m deep, 79.21 m² in area, with a detention time of 3.04 days; meant to lower remaining BOD and kill pathogens using sunlight.
What the source found
Across the ponds BOD fell by 14%, suspended solids by 17% and total nitrogen by 10%, while COD rose, and the discharge did not meet the national leachate standard for BOD, COD and total nitrogen. All three ponds fall outside design criteria: the facultative and maturation ponds are too deep, too short in detention time and overloaded. A redesign of the ponds and an added constructed wetland are recommended.
Samples taken every two weeks in the rainy season, April to May 2017, at the equalization tank outlet and at the outlet of each pond.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| Temperature | °C | 34.81 | |||
| Total suspended solids | TSS | mg/L | 72.33 | 60.33 | 17% |
| pH | 7.83 | 8.07 | |||
| BOD | BOD | mg/L | 3,959.63 | 3,399.13 | 14% |
| COD | COD | mg/L | 6,860 | 9,525.6 | |
| Total nitrogen | TN | mg/L | 373.33 | 334.43 | 10% |
| Mercury | Hg | mg/L | 0.0016 | 0.00072 | 55% |
Inlet: leachate leaving the equalization tank (anaerobic pond inlet). Outlet: outlet of the maturation pond. Averages of samples taken every two weeks in April and May 2017. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.