Aguato

    BOD and COD removal from hospital wastewater by a biofilm reactor, settling and filtration

    The wastewater treatment plant of a regional general hospital in Sumedang Regency, built in 2003 and evaluated after 17 years because of visible physical damage and changes from the original design. It treats domestic and medical wastewater; kitchen, laundry and laboratory streams are pretreated at several points and held in control tanks before reaching the plant. Design capacity is 50 m³/day and the recorded mean flow in November 2020 was 37 m³/day.

    Treatment line

    1. 01Automatic bar screen58 bars across a 480 mm channel.
    2. 02Buffer and equalisation tank5 m by 3.5 m by 3 m, about 34 hours retention at the recorded flow, longer than the design guide, so added aeration is advised.
    3. 03Fluidised bed biofilm reactor (aeration tank)About 13.7 hours hydraulic retention; organic loading well below the design range.
    4. 04Sedimentation tankSolids loading below the design range.
    5. 05Two filtration tanksFed by one pump at 15 m³/h split between the tanks; the first tank runs above the recommended filtration rate.
    6. 06Disinfection tankDosed with calcium hypochlorite.

    What the source found

    The treated water met the discharge standard for BOD, COD and suspended solids. Mean removal was 81% for BOD and 79% for COD; the drop was significant for BOD and COD but not for suspended solids. The unit checks found poorly settling, bulking sludge, too long a retention time in the equalisation tank, a filtration rate above the design range in the first filter and a chlorine dose slightly below the design guide.

    Three paired inlet and outlet samples on three days in October and November 2020, analysed by a laboratory and tested with a paired t-test, plus a design check of each unit.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    Total suspended solidsTSSmg/L10311
    BOD5BOD5mg/L37.777.2181%
    CODCODmg/L124.5426.6179%
    Hexavalent chromiumCr(VI)mg/L<0.01

    Inlet: wastewater at the inlet of the treatment plant. Outlet: treated water at the plant outlet. Means of three paired samples taken in October and November 2020. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.