Suspended solids and oil removal from marble mine cutting water in a lined clarification tank
An open marble mine uses about 25 m³/day of water for cutting, of which about 10 m³/day is thought to evaporate or stay between the blocks. The remaining 15 m³/day of wastewater is collected and settled, and its reuse in the cutting process was also looked at.
Treatment line
- 01Clarification tankSoil tank made watertight with a plastic cover, where the collected wastewater settles.
What the source found
The final values were below the national water pollution control limits for all measured parameters, so the tank was judged to work well and the method to be usable at marble mines.
Initial and final values of suspended solids, pH, colour, oil and grease and hexavalent chromium were determined for the wastewater settled in the tank.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| Suspended solids | TSS | mg/l | 106.5 | 58.3 | 45% |
| pH | 8.06 | 7.93 | |||
| Colour | Pt-Co | 83.5 | 47.5 | 43% | |
| Hexavalent chromium | Cr(VI) | mg/l | < 0.05 | < 0.05 | |
| Oil and grease | O&G | mg/l | 8.7 | 2.3 | 74% |
Inlet: marble mine cutting wastewater collected in the clarification tank, initial value. Outlet: the same wastewater in the clarification tank after sedimentation, final value. Initial and final values reported in the abstract; sampling plan not given. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.