COD and nitrogen removal from latex wastewater by anaerobic and aerobic membrane bioreactors
Wastewater and seed sludge came from a centrifuged latex factory in Mawanella, Sri Lanka, whose effluent is rich in organics, ammonia and sulfate from latex preservation and acid coagulation of skim latex. The raw water was first pretreated by magnetic seed coagulation with polyaluminium chloride, polymer, magnetic seeds and lime, and the study covers the biological membrane line that follows.
Treatment line
- 01Anaerobic membrane bioreactorA 15 litre cylindrical tank coupled to an external tubular ceramic membrane.
- 02Anoxic reactorSection of a single partitioned tank where nitrate is converted to nitrogen gas.
- 03Oxic membrane bioreactorAerated section with a submerged flat-sheet ceramic membrane and coarse bubble aeration, from which the final effluent is drawn.
What the source found
With a total hydraulic retention time of 6 days the line removed above 99% of COD and about 73% of ammonia and total nitrogen at full strength, and COD met the national discharge standards. Sulfate was partly removed, citric acid cleaning showed promise for controlling membrane fouling, and further polishing is suggested for nitrogen, phosphorus and sulfur.
Inlet and final effluent monitored over 225 days in four loading phases, with the figures taken from the last phase at full-strength wastewater; samples were taken between the pretreated influent and the final membrane effluent.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| COD | COD | mg/L | 22,158 | 118 | 99.5% |
| Ammonia nitrogen (inlet printed as NH3, outlet as NH4+-N) | NH3-N | mg/L | 1,537.3 | 412.3 | 73% |
| Sulfate as sulfur | SO4-S | mg/L | 477.1 | 238.6 | 50% |
| Total nitrogen | TN | mg/L | 3,487.6 | 947.3 | 73% |
| Total phosphorus | TP | mg/L | 145.1 | 2.2 |
Inlet: pretreated rubber latex wastewater entering the biological system. Outlet: permeate of the oxic membrane bioreactor (final effluent). Averages over phase 4 of the run, days 131 to 225, at full-strength wastewater. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.