COD and nitrogen removal from olive mill wastewater by an adsorbent bed and a reed wetland
Wastewater from three-phase olive mills in Jordan, an acidic, dark effluent rich in phenols and organic matter that is at present disposed of untreated at dumpsites, in evaporation ponds or on farmland. Wastewater from several mills was collected, stored and settled in a large tank for a month, then treated in a test system built on a university campus in Amman. The wetland tanks were first fed with municipal wastewater for four months to grow the microbial community.
Treatment line
- 01Pretreatment tank with adsorbent layersA 0.95 m² tank with three layers of volcanic tuff, the top layer mixed with granular activated carbon, with a retention time of about 38 days in the first month and about 71 days afterwards.
- 02Planted vertical-flow constructed wetlandA 0.57 m² tank filled with layered volcanic tuff and planted with common reed, with a steady-state retention time of about 17 days; an identical unplanted tank ran alongside for comparison.
What the source found
The adsorbent tank removed most of the phenols and much of the nitrogen, but its COD removal fell after about seven weeks, probably as the adsorbent surfaces filled, and the activated carbon made it costly to run. Across both steps the planted wetland line removed 98% of the COD, 99% of total nitrogen and 97% of ammonium, and did better than the unplanted tank. Phenols in the treated water still exceeded the national discharge limit, so further treatment is needed.
Weekly samples at the inlet and outlet of each step from February to July 2023, with the wetland loading raised in steps over the run.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| pH | 4.83 | 6.99 | |||
| Total COD | COD | g/L | 37.61 | 0.81 | 98% |
| Dissolved COD | sCOD | g/L | 10.82 | 0.78 | 93% |
| Total phenolic compounds | ppm | 182.58 | 0.74 | 99.6% | |
| Total nitrogen | TN | ppm | 610.6 | 6.7 | 99% |
| Ammonium | NH4+ | ppm | 2.86 | 0.09 | 97% |
| Nitrate | NO3− | ppm | 102.52 | 4.31 | 96% |
Inlet: raw olive mill wastewater entering the pretreatment tank. Outlet: outlet of the planted constructed wetland. Means of weekly analyses in 2023: the pretreatment step from February to July, the wetland from May to July. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.