Aguato

    Organic matter and solids removal from town sewage by anaerobic and facultative ponds

    A sewage plant serving part of Santa Fe do Sul, in the northwest of São Paulo state, Brazil, treats about a third of the town's sewage in two stabilisation ponds. The mean inflow over a 24-hour survey was about 2,620 m³/day, and the treated water is discharged to a local stream. Sludge had built up heavily in the anaerobic pond.

    Treatment line

    1. 01Bar screensTwo screens with 25 mm bar spacing.
    2. 02Grit chamberTwo chambers in parallel, meant to be cleaned daily in turn.
    3. 03Parshall flumeMeasures the incoming flow.
    4. 04Anaerobic pond with dividing baffleAbout 4,600 m² and 9,500 m³, up to 3.5 m deep; sludge had filled about 3,850 m³, cutting the retention time from about 3.5 to about 2.2 days.
    5. 05Facultative pondAbout 10,350 m² and 22,000 m³, up to 2.2 m deep, with a retention time of about 8 days.

    What the source found

    The plant removed 79% of BOD and 67% of COD, but BOD removal fell short of the state minimum and faecal coliforms and settleable solids in the effluent exceeded the permitted values. Suspended solids fell by 54%, though they rose again in the facultative pond because of algae. Dredging the anaerobic pond and adding a post-treatment step were recommended.

    A 24-hour hourly survey of the inflow, a depth survey of sludge in both ponds, and samples at least twice a month over three three-month campaigns in the wet, dry and early wet seasons at the inlet, between the ponds and at the outlet.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    Temperature°C25, 26.6 and 27.4 in the three campaigns22.4, 22.8 and 24.8 in the three campaigns
    pH6.957.17
    Dissolved oxygenDOmg/Lnil in all measurements0.96
    BODBODmg/L38963.6
    Filtered BODsBODmg/L37.788%
    CODCODmg/L908298.767%
    Total coliformsTCMPN/100 mL87,600,00014,400,000
    Faecal coliformsFCMPN/100 mL30,600,0003,070,000
    Total solidsTSmg/L80759327%
    Total fixed solidsTFSmg/L2853330%
    Total volatile solidsTVSmg/L52326050%
    Total suspended solidsTSSmg/L37517154%
    Dissolved solidsTDSmg/L3704220%
    Settleable solidsmL/L13

    Inlet: raw sewage at the plant inlet. Outlet: outlet of the facultative pond (final effluent). Means of 20 samplings over three three-month campaigns in the wet, dry and early wet seasons. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair. A parameter at 0% did not fall between the inlet and the outlet.

    Similar references