Ammonia removal from stabilised landfill leachate by ammonia stripping and activated sludge
Raw leachate was collected at a closed controlled landfill for household waste in Londrina, Paraná, operated from 1974 to 2010; the leachate was already stabilised. It was stored in a 15 m³ tank at a university laboratory and treated in a 1 m³ pilot installation run in sequential batches, to produce biologically treated leachate for bench post-treatment tests with coagulation and activated carbon.
Treatment line
- 01Ammonia strippingPreliminary step for partial removal of ammoniacal nitrogen.
- 02Activated sludge in sequential batchesNitrification and denitrification of the remaining nitrogen.
What the source found
The line removed 98% of ammoniacal nitrogen and most of the nitrite and nitrate. It did little to the recalcitrant organic matter: true colour fell by 6% and COD by 15%, both far from the required standards, so a physico-chemical post-treatment was needed before discharge.
Four batches produced from May to August 2012, giving about 4 m³ of treated leachate, with the raw and treated leachate each characterised.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| pH | 8.9 | 8.5 | |||
| Alkalinity | Alk | mg CaCO3/L | 1,914 | 1,608 | 16% |
| Temperature | °C | 23.7 | 23.6 | ||
| Apparent colour | uH | 4,031 | 3,504 | 13% | |
| True colour | uH | 3,598 | 3,393 | 5.7% | |
| COD | COD | mg/L | 1,344 | 1,144 | 15% |
| Dissolved organic carbon | DOC | mg/L | 672 | 672 | |
| Total Kjeldahl nitrogen | TKN | mg N-NH3/L | 304 | 67 | 78% |
| Ammoniacal nitrogen | NH3-N | mg N-NH3/L | 236 | 5 | 98% |
| Nitrite nitrogen | NO2-N | mg N-NO2/L | 105 | 3 | 97% |
| Nitrate nitrogen | NO3-N | mg N-NO3/L | 21 | 3 | 86% |
| Chloride | Cl− | mg/L | 1,828 | 1,935 | 0% |
| Total solids | TS | mg/L | 5,554 | 6,456 | 0% |
| Total suspended solids | TSS | mg/L | 232 | 73 | 69% |
| Total dissolved solids | TDS | mg/L | 5,322 | 6,383 | 0% |
Inlet: raw leachate. Outlet: leachate after ammonia stripping and activated sludge. Characterisation of the raw and the biologically treated leachate from four batches run from May to August 2012. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair. A parameter at 0% did not fall between the inlet and the outlet.