    Infrastructure program managers and owner's engineers for conveyance, storage, treatment, and distribution assets.

    291 providers

    This page is a good fit if you need:

    • Filtration or Reverse Osmosis (RO) capabilities
    • Suppliers with utilities sector experience
    • Providers operating in China or United Kingdom
    Providers
    291
    Verified
    5
    Countries
    35

    Can't find the right fit? Post a brief and let qualified suppliers come to you.

    Post a project

    Find a Water Infrastructure Provider

    Showing 181-200 of 291

    291 results from 291 matched providers

    Water Infrastructure Services: Pipeline Inspection, Rehabilitation, and Asset Maintenance

    Water infrastructure services cover the inspection, maintenance, repair, and rehabilitation of the physical assets that form water supply and wastewater networks: pipelines, sewers, pumping stations, service reservoirs, and treatment works. Pipeline inspection: CCTV sewer inspection (self-propelled crawler, 100 to 1,800 mm diameter; WRc SRM 5 grading system for defect severity; deliverable is video file plus coded defect schedule; used for pre-design condition assessment, post-construction acceptance testing, and regulatory compliance under EA Water Environment (Water Framework Directive) (England and Wales) Regulations 2017); acoustic leak detection for water mains (correlation leak detection: two sensors placed on pipe either side of suspected leak; cross-correlation of acoustic signal identifies leak position to 1 to 3 m accuracy; leak noise logger surveys: overnight (1 to 4 am) when demand is low and leak noise signal-to-noise ratio is highest); SmartBall (Pure Technologies / Xylem): free-swimming acoustic sensor propelled by flow through large-diameter mains (150 to 2,000 mm); detects pitting and wall loss from acoustic signature; useful for large trunk mains where stopping flow is costly. Pressure management: pressure reducing valves (PRV) reduce distribution network pressure to minimum required to supply highest customer; every 1 metre of excess pressure causes approximately 0.5 to 1.0 L/property/day additional background leakage (pressure-leakage relationship per WRc Leakage Pressure Management Guide); advanced PRVs (Bermad, Cla-Val, Singer) with flow-modulated control respond to diurnal demand variation (higher pressure at night when customer demand is low and mains pressure rises).

    Pipeline rehabilitation: water mains rehabilitation avoids full excavation and replacement, reducing cost (50 to 70 percent saving vs open-cut replacement), disruption, and environmental impact. Key techniques: (1) Cement mortar lining (CML): in-situ application of cement mortar to internal surface of metallic mains (100 to 600 mm diameter); rotating head sprays mortar at 6 to 15 mm thickness; restores hydraulic performance (C-factor from 80 to 130 to 140 after lining); provides barrier between water and corroded iron (reduces leaching of iron, lead, and organics); BS EN 542 specification for CML; typically combined with external cathodic protection for wrapping protection; production rate 200 to 500 m/day; (2) Sliplining: insertion of smaller bore PE pipe inside existing deteriorated main; annular space grouted; hydraulic capacity reduced by diameter reduction (30 to 50 mm reduction for 100 mm DR9 PE pipe insertion into 150 mm cast iron); suitable for large-diameter (greater than 300 mm) moderately deteriorated pipes; (3) Cured in place pipe (CIPP) lining for sewers: felt liner saturated with thermosetting resin (polyester or vinyl ester) inserted by inversion or pulling; cured by UV, hot water, or steam; liner thickness 4 to 25 mm depending on pipe condition and structural requirement; BS EN ISO 11296-4; production rate 100 to 300 m/day; cost GBP 100 to 500/m. Sewer renovation: sewer structural rehabilitation is selected by condition assessment (WRc SRM Grade 4 to 5); choice between full replacement (open cut; cost GBP 800 to 3,000/m in urban areas), CIPP lining, or spray lining (glass-fibre reinforced mortar spray; typically 8 to 12 mm; BS EN ISO 11296-4 Part 3).

    Pumping station and treatment works maintenance: water infrastructure services include planned preventive maintenance (PPM) and reactive maintenance for pumping stations (UK water industry operates approximately 100,000 pumping stations), water treatment works, and STWs. Pump maintenance: vibration monitoring (accelerometer sensors on pump bearings; ISO 10816-3 vibration severity zones; Zone A: good condition; Zone D: damage occurring); thermographic surveys (thermal imaging camera; detects overheating bearings, motor windings, and electrical switchgear at temperature rise greater than 20 degrees C above ambient); pump performance testing (flow vs head characteristic curve measured in-situ with clamp-on ultrasonic flow meter and pressure gauges; compare with pump manufacturer curve to identify wear and efficiency loss; replace impeller or full pump when efficiency drops below 70 percent of design). Control system maintenance: PLC and SCADA system maintenance (Siemens, Allen-Bradley, Schneider platforms; SCADA server updates, cybersecurity patching (IEC 62443), UPS battery replacement every 3 to 5 years); HMI calibration; 4 to 20 mA instrument loop calibration (multimeter, hand-held HART communicator). Service contracts: water companies procure maintenance services through long-term framework agreements (10 to 15 year O&M contracts); providers: Veolia, SUEZ, AECOM, MWH Treatment, Jacobs, Doosan Enpure; contract KPIs: availability (greater than 99.5 percent for pumping stations); energy efficiency (kWh/m3 pumped); emergency response time (4 hours for critical pumping stations).

    Frequently Asked Questions

    What is sewer CCTV inspection and what does it show?

    Sewer CCTV inspection uses remote-controlled cameras inserted into sewer pipes to record internal condition, identify defects, and produce a coded condition assessment. Equipment: self-propelled crawler (for 150 to 600 mm diameter sewers) or larger tracked vehicles (600 to 1,800 mm); pan-tilt-zoom (PTZ) camera head; continuous recording to onboard DVR or surface unit; crawler launched from manhole; operated via surface control unit with live video feed and cable reel. Survey deliverable: video file (MP4) plus coded defect schedule using WRc SRM (Sewerage Rehabilitation Manual) coding system (UK standard) or Wincan/PACP (Pipeline Assessment Certification Program, North America); defect types recorded: structural defects (cracks: longitudinal L, transverse T, circumferential C; deformation; fracture; collapse; open or displaced joints; displaced pipe; root intrusion; running water ingress); service defects (displaced connections, open joints); ancillary defects (debris, siltation, deposits). Condition grade: WRc SRM grades: Grade 1 (serviceability defect only, no structural concern); Grade 2 (minor structural defect); Grade 3 (moderate, action required within 2 to 5 years); Grade 4 (significant, action within 1 to 2 years); Grade 5 (critical, immediate action required). Uses in water industry: pre-design survey for rehabilitation or replacement schemes (identifies extent of deterioration for cost estimate); post-construction survey (verifies installation quality for sewer adoption under Section 38 or Section 104 of Water Industry Act 1991); regulatory compliance (EA may require CCTV survey as part of sewer condition reporting under Environmental Permit or WINEP); leakage investigation (identifies cracked pipes or open joints allowing infiltration of groundwater into sewers).

    How is acoustic leak detection used on water mains?

    Acoustic leak detection exploits the fact that a pressurised pipe leak generates a broadband acoustic noise (hissing, turbulence) that propagates along the pipe wall as a stress wave. Methods: (1) Correlation leak detection (active method): two acoustic sensors clamped to pipe fittings (hydrants, valves, standpipes) on either side of a suspected leak; sensors record acoustic signals simultaneously over 2 to 5 minutes (sampling rate 5,000 to 25,000 Hz); cross-correlation algorithm applied to the two time-series signals; the time delay (tau) at maximum correlation locates the leak: distance from sensor 1 = (d - tau x v) / 2, where d = pipe length between sensors, v = acoustic propagation velocity (dependent on pipe material and diameter: PVC 300 to 400 m/s; cast iron 800 to 1,200 m/s; steel 1,000 to 1,500 m/s; PE 250 to 350 m/s); typical positioning accuracy 0.5 to 3 m; equipment: Gutermann Correlux, Sewerin Aquaphon, Primayer Enigma; (2) Leak noise logging (passive screening): battery-powered acoustic loggers (Primayer Permalog+, Gutermann Zonescan, SebaKMT HL800) installed on hydrants or valves throughout a district metered area; loggers record acoustic noise level every 15 to 30 minutes through the night (1 to 4 am when demand is lowest and leak noise is most clearly audible); data uploaded wirelessly (GSM/LoRa); loggers with elevated noise flagged for correlation survey follow-up; area covered: 100 to 500 m per logger depending on pipe material and soil type (clay soil and metallic pipes: up to 500 m; plastic pipes: 100 to 200 m); system-wide screening of DMA possible within 2 to 3 nights. SmartBall and PipeDiver: free-swimming sensors propelled by flow through large-diameter mains (greater than 200 mm); cover 5 to 30 km per run; detects leaks, cracks, and wall loss; used for uninspectable trunk mains where access is limited.

    What does a water infrastructure maintenance contract typically include?

    A long-term water infrastructure operations and maintenance (O&M) contract for pumping stations, treatment works, or distribution networks typically covers: Scope of services: planned preventive maintenance (PPM) of all mechanical, electrical, and I&C assets (pump overhaul schedule: impeller inspection every 5,000 hours; motor winding insulation test annually; gearbox oil change per manufacturer schedule; valve exercising programme: all isolation valves exercised quarterly; PRV calibration annually; all 4 to 20 mA instrumentation calibrated annually); reactive (corrective) maintenance (response to alarms and failures; emergency response time: Level 1 critical (no supply): 2 hours response; Level 2 serious: 4 hours; Level 3 routine: 24 hours; repair to restoration: 95 percent within 8 hours for Level 1); statutory compliance (EA Environmental Permit compliance reporting; EA Pollution Incident Prevention; DWI monitoring returns for treatment works; HSE PSSR pressure vessel inspections; COSHH assessment for chemical handling); operational monitoring (SCADA trending; energy use monitoring; KPI reporting). Contract KPIs: pumping station availability (target greater than 99.5 percent); first-time fix rate (percentage of reactive callouts resolved on first visit; target greater than 80 percent); preventive maintenance compliance (percentage of PPM tasks completed on schedule; target greater than 95 percent); environmental incidents (target zero Category 2+ pollution incidents per year); energy consumption (kWh/m3 pumped; target within 5 percent of baseline); customer serviceability (DG2 low pressure; DG3 supply interruptions). Contract form: typically NEC4 Term Service Contract (Option E or F); performance-incentivised with KPI bonus/penalty mechanism; term 5 to 15 years; mobilisation period 3 to 6 months.

    How are leaking water mains found and repaired?

    Leaking water main detection and repair: Detection: step-test methodology defines DMA (District Metered Area) leakage: overnight minimum flow (OMF) measured at DMA inlet meter between 2 and 4 am (when customer demand is lowest); OMF minus estimated legitimate night use (LNU, approximately 6 to 8 L/property/hour) gives minimum night flow (MNF) representing background leakage plus active bursts; if MNF exceeds leakage target, active leak detection survey deployed. Active leak detection: acoustic logger survey screens DMA for elevated noise (2 to 3 night survey); correlation survey on flagged pipes narrows location to within 1 to 3 m; road surface sounding (listening stick or ground microphone - Sewerin ground microphone, SebaKMT HL800P) confirms leak position to within 0.3 to 1 m for excavation. Repair: small leaks on 100 to 150 mm mains: single repair clamp (repair collar, stainless steel or ductile iron; Romac, Viking Johnson, Mueller brands; tightened over leak; 15 to 45 minutes repair time with flow maintained); main isolation and full joint or section replacement if clamp not suitable (stop-tap isolation of 200 m section; replacement of defective section in PE or ductile iron; reconnection with mechanical couplings: Victaulic or Viking Johnson coupling). Service pipe (15 to 25 mm lead or copper): complete replacement from main to boundary stop-tap using 32 mm MDPE (blue) with compression fittings; lead service pipe replacement programme required under Lead and Nickel Regulations 2020 (all UK lead service pipes to be replaced by 2035; approximately 1.5 million remaining; cost GBP 2,000 to 5,000 per property). Reinstatement: highways reinstatement to New Roads and Street Works Act (NRSWA) 1991 and HAUC (UK) Specification for Reinstatement of Openings in Highways; permanent reinstatement within 6 months of excavation; core samples may be taken by highway authority to verify reinstatement quality.

    Case Study·Water distribution network management
    Challenge

    A water company in the South East managing a 3,400 km distribution network had annual leakage of 68 L/property/day against an Ofwat target of 48 L/property/day, with GBP 4.2 million per year in ODI penalties accruing. Acoustic logger coverage was under 30 percent of the network and the company had no predictive pipe failure model to prioritise its DN100 to DN150 Victorian cast iron mains replacement programme.

    Approach

    The company deployed 3,200 Gutermann Zonescan 820 acoustic loggers across all 1,840 DMAs over 18 months, achieving 88 percent network coverage. A random forest pipe failure model was built using 12 years of burst history, pipe material, age, soil type, and pressure data, generating a probability-of-failure score for each of 47,000 pipe segments. The top 8 percent of high-risk segments (3,760 pipes, 280 km) were prioritised for replacement using 110 mm HDPE SDR11, combined with advanced PRV installations in 24 pressure zones to reduce average zone pressure from 58 m to 46 m.

    Outcome

    Leakage fell from 68 to 49 L/property/day over 3 years, within the Ofwat target band. ODI penalties ceased and an Ofwat reward of GBP 1.8 million was earned in year 4 for sustained outperformance. Mains burst rate fell from 312 per 1,000 km per year to 187 per 1,000 km per year. The predictive model demonstrated 71 percent accuracy in identifying pipes that burst within a 3-year prediction window on the hold-out validation dataset.

    Questions to Ask Shortlisted Providers

    1. 1

      What is the current acoustic logger coverage across your DMA network, and do you have real-time minimum night flow visibility for all DMAs?

      Ofwat expects water companies to have comprehensive leak detection capability; coverage below 70 percent of network length means that large sections cannot be screened passively and active detection surveys must be deployed reactively after burst events, which is significantly less cost-effective than proactive logger-based screening.

    2. 2

      Do you have a condition-graded asset register for all mains above DN100, and has a probability-of-failure model been applied to prioritise replacement?

      Risk-based prioritisation (using pipe age, material, soil conditions, burst history, and CoF scoring) is now expected by Ofwat as evidence that AMP8 mains renewal totex is efficiently targeted; companies without a quantitative prioritisation model are exposed to disallowance risk at price review.

    3. 3

      What is the current operational pressure in each of your pressure zones, and have advanced PRVs been assessed against the cost of leakage reduction?

      Pressure management is typically the lowest-cost leakage intervention (GBP 0.01 to 0.05 per litre per day reduced, versus GBP 0.20 to 0.80/L/day for active leak repair); if zone pressures significantly exceed the minimum required, PRV optimisation should precede expensive mains rehabilitation.

    4. 4

      For sewer inspection, which grading standard does your CCTV contractor use and is the survey data transferred to your GIS in a compatible format?

      WRc SRM 5th Edition is the UK standard but some contractors still code to older versions; data delivered in Wincan or PACP format that cannot be automatically imported to the client's ESRI ArcGIS or Maximo system significantly increases post-survey processing cost and delays priority scoring.

    5. 5

      How does your O&M contract handle emergency response for Category 2+ EA pollution incidents caused by sewer collapse, and is the response time obligation formally defined?

      EA Category 2 pollution incidents carry Ofwat ODI penalty exposure and reputational risk; contracts that specify response time obligations for sewer structural failure events (typically 4-hour response, 24-hour containment) with associated liquidated damages create the right contractor incentive to maintain sewer condition proactively.

    What Drives Cost in This Category

    Acoustic logger procurement model (purchase versus subscription)

    Purchasing 1,000 acoustic leak noise loggers outright costs GBP 700,000 to 1,100,000 (GBP 700 to 1,100 per unit for Gutermann Zonescan, Primayer Permalog+); a subscription or managed service model (GBP 80 to 120 per logger per year including software, data management, and survey support) converts the capex to opex and avoids large upfront investment, but over a 10-year period costs 10 to 20 percent more in total expenditure than outright purchase.

    Sewer CCTV inspection mobilisation and programme continuity

    Mobilising a CCTV crew (van-mounted system, operator and assistant) costs GBP 500 to 800 per day in standing costs regardless of footage collected; inefficient programming (short individual jobs, long travel distances between inspection sites) reduces productivity to 100 to 200 m per day versus an efficient programme achieving 400 to 600 m per day; annual inspection programmes for 5,000 km networks should be block-tendered for 3 to 5-year terms to achieve crew continuity and productivity gains.

    Reactive versus planned maintenance cost ratio

    Reactive (emergency) repairs to sewer collapses or main bursts cost 3 to 6 times more than planned maintenance of the same asset (emergency out-of-hours mobilisation, traffic management on short notice, premium material cost, unplanned reinstatement); a reactive maintenance ratio above 40 percent of total maintenance spend is a red flag indicating insufficient proactive condition monitoring and planned maintenance budget.

    Lead service pipe replacement programme unit cost

    Lead service pipe replacement costs GBP 2,000 to 5,000 per property (depending on excavation depth, footway condition, and presence of shared supply pipes); the national programme of approximately 1.5 million remaining lead pipes has a total cost of GBP 3 to 7 billion; economies are achieved by combining lead pipe replacement with planned roadworks (Section 58 protected street avoidance) and coordinating with highway authorities on planned resurfacing programmes to reduce reinstatement cost.

    Key Regulations & Standards

    Water Supply (Water Fittings) Regulations 1999 (WSFR 1999) and WRAS Approval

    All pipes, fittings, and components used in mains repair or rehabilitation must comply with WSFR 1999 (Regulation 4: no deterioration of water quality; Regulation 5: no undue consumption or misuse); WRAS-approved materials are required for drinking water contact applications; WRAS Approved Products List is the reference for compliance.

    Lead and Nickel Regulations 2020 (UK Retained EU Law) and DWI Lead Standard

    The lead parametric value in the Water Supply (Water Quality) Regulations 2016 is 10 ug/L at the consumer tap; the Lead and Nickel Regulations 2020 require all remaining lead service pipes to be replaced by 2035; water companies must report progress on lead pipe replacement to DWI annually; AMP8 includes GBP 2 to 4 billion of capital allowance for lead pipe replacement across the sector.

    WRc Sewerage Rehabilitation Manual (SRM) 5th Edition - Sewer Condition Grading

    The WRc SRM 5th Edition is the UK industry reference for sewer CCTV survey coding and condition grading (Grade 1 to 5); all sewer inspection data submitted to the EA or used in EA Environmental Permit compliance must be coded to WRc SRM; Grade 4 and 5 defects require remedial action within 1 to 2 years; EA requires evidence of systematic sewer condition assessment as part of WINEP obligations at large STWs.

    BS EN ISO 11296-4 (CIPP Lining of Sewers) and BS EN 13566 (Plastic Pipe Systems)

    CIPP lining of gravity sewers must comply with BS EN ISO 11296-4:2018 (structural design, material properties, installation, and testing of CIPP liners for gravity sewers); structural design must demonstrate that the liner can sustain external groundwater pressure and live loads without deformation; liner thickness calculation per Appendix A of BS EN ISO 11296-4; post-installation CCTV survey required to verify installation quality before acceptance.