Aguato

    Suspended solids and COD removal from sugar factory effluent by waste stabilisation ponds

    The wastewater treatment plant of a sugar factory in Bungoma South sub-county, Bungoma County, Kenya, which produces 1,500 to 2,700 m³ of effluent per day and discharges it to a river through an open channel about 3 km long. Ahead of the ponds the effluent passes bar screens, a grit chamber and a sedimentation basin with a two-day retention, and sodium carbonate is dosed just before the aerated ponds to correct the very acidic effluent. The plant has struggled to meet the national discharge standards.

    Treatment line

    1. 01Two aerated pondsEach 3 m deep with a 7-day retention and mechanical aerators, which were faulty and had been out of service for a long time.
    2. 02Two secondary facultative ponds in series1.5 m deep, with retention times of 8 and 10 days.
    3. 03Maturation pond1.2 m deep with a 25-day retention, polishing the effluent before discharge.

    What the source found

    Across the ponds COD fell by 56%, suspended solids by 78% and turbidity by 78%, while the change in BOD was not statistically significant, and the final effluent did not meet the discharge standards. The aerated ponds performed worst, with COD rising across them, which was put down to the broken aerators, the acidic water, near-square ponds and badly placed inlets and outlets that allow short-circuiting. Keeping the aerators maintained and running and moving one pond outlet were recommended.

    Samples at the inlet and outlet of the aerated, facultative and maturation ponds every two weeks from April to September 2018.

    Water in, water out

    ParameterSymbolUnitInletOutletRemoval
    Temperature26.0624.95
    ColourPt.Co5027.545%
    pH4.117.04
    Electrical conductivityECµS/cm388.5478
    TurbidityNTU877196.578%
    CODCODmg/l1,36060056%
    Total suspended solidsTSSmg/l632.514078%
    Total dissolved solidsTDSmg/l233.1286.80%
    BODBODmg/l875240

    Inlet: raw effluent at the inlet of the aerated ponds. Outlet: maturation pond effluent, the final discharge. Samples every two weeks from April to September 2018; Table 2 values for the raw effluent and the maturation pond effluent. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair. A parameter at 0% did not fall between the inlet and the outlet.