Cyanide and nitrogen removal from gold mine water by a four-stage moving bed biofilm reactor
A gold mine in Ghana that uses cyanide to extract gold stores its effluent in a tailings pond; the pond water is pre-treated in a primary clarifier with a cationic polymer and is then pH-corrected, and nitrogen compounds from blasting and cyanide can exceed the discharge limits. The mine uses reverse osmosis when it must discharge, and ran this pilot on the pre-treated water to test a biological alternative as it expands its treatment capacity.
Treatment line
- 01Holding tankReceives the pre-treated water, which is pumped from here to the first reactor at a constant rate.
- 02Aerobic moving bed biofilm reactor (R1)1 m³ aerated reactor with plastic biofilm carriers, 1.3 to 1.7 hours of retention; phosphoric acid is dosed for cell growth.
- 03Aerobic moving bed biofilm reactor (R2)1 m³ aerated reactor, 1.3 to 1.7 hours of retention.
- 04Anoxic moving bed biofilm reactor (R3)1 m³ reactor stirred by a mechanical mixer for denitrification, 1.3 to 3.5 hours of retention, dosed with molasses or ethanol as a carbon source.
- 05Aerobic moving bed biofilm reactor (R4)1 m³ aerated reactor, 1.3 to 3.5 hours of retention, added to the line after 3 months.
What the source found
Spiking the feed with untreated process plant effluent, likely high in copper, inhibited the reactors for three months; once it stopped, cyanide removal was complete within a week and nitrification within three more weeks, and the effluent met the discharge permit. When cyanide in the feed was raised in steps, the reactors recovered within a few days while denitrification was not affected, and 99% cyanide and total nitrogen removal was shown over 9 days of continuous operation at 26 to 28 °C.
Daily grab samples of the feed and treated water were analysed on site over an 18-month trial from May 2020 in four phases, two of them with the feed spiked with extra cyanide.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| pH | 7.73 | ||||
| Electrical conductivity | EC | µS/cm | 1,394 | ||
| Turbidity | NTU | 23 | |||
| Soluble COD (total) | sCOD | mg/L | 62.6 | ||
| Total suspended solids | TSS | mg/L | 18 | ||
| Sulfate | SO42− | mg/L | 230 | ||
| Copper | Cu | mg/L | 0.3 | ||
| Ammonium nitrogen | NH4-N | mg/L | 4 | ||
| Nitrite nitrogen | NO2-N | mg/L | 40.6 | ||
| Nitrate nitrogen | NO3-N | mg/L | 33.2 | ||
| Free cyanide | CN− | mg/L | 0.2 | ||
| Total nitrogen | TN | 99.0% | |||
| Free cyanide, spiked feed | CN− | mg/L | 20 | 99.0% |
Inlet: pre-treated mine water fed to the pilot. Outlet: final effluent of the pilot reactors. Inlet values are averages of daily samples over the trial; the source prints no effluent averages, only a stated removal for cyanide and total nitrogen over 9 days of continuous operation with the feed spiked to 20 mg/L free cyanide. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.