COD and colour removal at an auto parts factory by extended-aeration activated sludge
An automotive parts factory in the state of Pernambuco treats its wastewater in its own activated sludge plant run in extended aeration mode. The plant was one of six activated sludge works studied for how well they treat and which microorganisms live in their sludge.
Treatment line
- 01Grit chamberInlet of the works, where raw wastewater was sampled.
- 02Aeration tankActivated sludge with extended aeration, sampled for its microorganisms.
- 03Secondary clarifierLast unit, where treated water was sampled.
What the source found
COD removal was 96%, 92% and 99% on the three visits, and the effluent met the national discharge rules for BOD and ammonia each time. On the third visit the plant also removed 99% of colour, 96% of suspended solids and 91% of turbidity, and both ammonia and nitrate fell, which may mean partial nitrification with denitrification or other nitrogen pathways. The microorganisms found on that visit gave a mixed picture: some kinds point to good treated water, others to low treatment efficiency.
Three single sampling visits in the dry season, in October and November 2014 and July 2015, at the grit chamber inlet and the secondary clarifier outlet.
Water in, water out
| Parameter | Symbol | Unit | Inlet | Outlet | Removal |
|---|---|---|---|---|---|
| COD | COD | mg O2/L | 10,692 | 130 | 99% |
| BOD5 | BOD5 | mg O2/L | 2,500 | 5 | 99.8% |
| Total solids | TS | mg/L | 6,289 | 2,469 | 61% |
| Fixed solids | FS | mg/L | 3,217 | 1,823 | 43% |
| Volatile solids | VS | mg/L | 3,072 | 646 | 79% |
| Total suspended solids | TSS | mg/L | 3,350 | 118 | 97% |
| Fixed suspended solids | FSS | mg/L | 450 | 31 | 93% |
| Volatile suspended solids | VSS | mg/L | 2,900 | 87 | 97% |
| Ammonia nitrogen | NH3-N | mg/L | 66 | 0.82 | 99% |
| Nitrate nitrogen | NO3-N | mg/L | 340 | 28.1 | 92% |
| Electrical conductivity | EC | µS/cm | 6,581 | 4,818 | |
| Colour | mg Pt-Co/L | 7,200 | 88 | 99% | |
| pH | 7 | 7.5 | |||
| Turbidity | NTU | 546 | 47.6 | 91% |
Inlet: grit chamber inlet. Outlet: secondary clarifier outlet. One inlet sample at the grit chamber and one outlet sample after the secondary clarifier, taken at the same moment on 22 July 2015, in the dry season. Values and units are as the published source prints them. Removal is worked out from the two values, or is the source's own figure where it prints no pair.